The WEMAP 2002 Intertidal Wetlands project required innovative ways to reach a site. Most sites involved using a boat to get to the shallowest point and then walking to the exposed intertidal site dragging the equipment. In some cases, we walked in mud up to our thighs or we had to skid along the surface on boogie boards.